Avoiding mistakes with GIS implementation in Power Distribution Utilities

Noida Power Company Ltd (NPCL), a joint venture between the RP-Sajiv Goenka Group, a leading business house in India and Greater Noida Industrial Development Authority, distributes power in Greater Noida, near Delhi in Uttar Pradesh. The Company started its operations in December 1993 under a 30-year license from U.P. Government and is among the leading companies to use GIS technology with vast experience.pManifold team spoke to Mr. Rajiv Goyal, Head (Projects and Power Trading) and Mr. Vikas Gupta, Manager (GIS) to understand their experience in GIS implementation and the best practices adopted by NPCL. The below shared are the author’s personal views and not to be associated with any of his company’s and other associations.

Q1) What has been NPCL experience with its GIS implementation?

A)

  • To make GIS successful, it should be a part of mandate in process life-cycle of utilities.
  • The main problem that we face after Implementation is timely updation of data on periodic basis but we had overcome by making the process starting from Planning, Implementation and billing of any New Connection, Network Augmentation, Network Changes vetted with GIS Department before Implementation.
  • We have formulated an end-to-end GIS solution for analysing and optimizing the power distribution network, initiating this project right from conceptualization phase and completed the same by integrating with other OSS (Operational Support Systems) systems like SCADA, billing systems etc. The scope of the GIS implementation included the creation of land base data, network mapping over the land base, data modelling, implementation of GE Smallworld software as a core GIS, Network Analysis tools for Load flow Analysis and finally, the integration of the GIS system with other OSS. The add-ons specifically developed by us for the Indian conditions might be of good value to other utilities.
  • NPCL is amongst India’s first Companies to implement GIS within organisation. We have vast experience and rich technical expertise in implementing best of the updated technology on periodic basis.

Q2) What top venues to optimise GIS execution and save cost and time overruns?

A)

  • Although in Utility GIS has lot of possible integrations with other systems, but basic fact is that, utilities deviate in their focus in maintaining Data quality by not making clear and mandatory processes for data updations, which is a prime important criterion for accurate results with any Integration.
  • Since NPCL Licence Area, Greater Noida is one of the biggest emerging areas in terms of Infrastructure Development and population density. The future planning and Construction of 220/33 kV Substations is a continuous process which includes:
    • Planning of Network Development
    • New Substation Location Planning
    • Customer planning services for new connections
    • Analysis of performing/non performing areas using Satellite Imagery
  • To achieve the same we would have to:
    • To maintain positionally accurate data as a repository to manage our assets digitally using high-end GIS software specially meant for utilities.
    • GIS is to be used as a decision making tool for further network planning, network augmentation, O&M Planning and commercial applications as well as new service connections, helps in managing deployment of resources in a cost effective manner.
    • Data in GIS will also be used in carrying out the Network Analysis like Load Flow Analysis on our feeders.
  • NPCL started technology-aided utility mapping and utility locating solutions like GPS PDA’s for positional data collection. We have observed that utility mapping provides proactive, accurate solutions to aid in their construction and planning projects, without straining their financial resources and wasting their time and budget.
    • We are adhering to gathering accurate and real-time data in the form of digital maps.
    • Integrate GIS with SAP, OMS, SCADA and DMS. Perform technical optimization of network design as well as analyze real time data from SCADA/DMS for network performance /fault analysis.
    • Utilize GIS in daily asset management and other utility business processes.
    • Outage management System integrated with GIS to optimize call closure time.
    • Employ network tracing and supply re-routing information from GIS & OMS, respectively, to improve accuracy of Energy Audit at 11 kV/LT level.

Q3) What RoI to look from GIS implementation and integration? What commitments required from Utility operator to manage useful GIS implementation?

A)

  • The GIS solution was envisaged in order to model their physical workspace into a digital workspace. An enterprise-wide integrated GIS solution was planned in order to maximise the benefits from various IT systems like SAP, IS-U CCS, SCADA, DMS, AMR and Network Analysis. The ultimate purpose was to help utilities solve business problems and achieve international level of customer service. Sustainable enterprise wide initiatives like GIS are dependent on obtaining senior management’s buy-in. This, in turn, depends on the performance evaluation of the investment. Return on investment (ROI) is calculated to evaluate the efficiency of the investment.
  • The goal of the cost-benefit analysis process is to permit a fair determination of the worth of an investment in GIS technology. The cost-benefit analysis should cover the projected life-cycle or the portion of the projected life-cycle up until the pay back is reached, whichever is shorter.
  • The GIS Costing Implies with in following line Items:
    • Software and Hardware Procurement: 25%
    • Implementation of Data Model/Customisation of Applications/Reports: 20%
    • Electrical and Landbase Data Creation/Updation, Consumer Indexing and Data  Ingestion: 35%
    • Customisation/Interface Development with other systems: 20%
  • There are many benefits to implementing a GIS. However, it is understood that none of these benefits are real unless the products provided by the GIS in mapping and modeling the system result in a change in the operation of the utility. What this means is that if the map products delivered from the GIS are mirror duplications of the manually drawn product the project team has not tapped the potential for flexibility, accuracy, standardization, and clarity which a GIS offers. Also, modeling an electrical network for fuse coordination or phase balancing has no inherent value in and of itself. The model must be accurate and the changes must be implemented in the field before there is a quantifiable benefit. Assuming that the project team has accomplished their task of applying the GIS to all of its potential, there are really several benefits that the utility can derive. This includes:
    • Increased productivity in map updating and information handling.
    • Map accuracy which equates to crew safety and productivity.
    • One source data updates which mean fewer errors and less redundancy of effort.
    • Improved archiving and retrieval of information which improves utility responsiveness to the customer.
    • Accurate and timely information which is the basis for improving operations.
    • System modeling which is the basis for improved system reliability.
    • Company-wide accessibility to information.
  • Utility operators will need a GIS-based view of their utility in order to make   the best decisions about key issues such as managing meters and customers, and incorporating renewable energy. Field crews will depend even more heavily on GIS for implementing an advanced metering infrastructure (AMI) and keeping current with data collection.

Q4) While all focus has been on GIS first data collection, very little has been organised around keeping GIS data updated, and integrable & useful for decision support to Asset Mgmt., O&M, CRM and other modules etc. What are best practices recommendations for Indian utilities here?

  • After building the GIS, data maintenance is another major issue an organization needs to address. The questions that need to be asked are who, when and how to maintain the GIS data. Many organizations have existing data maintenance procedures for the CAD database. These procedures are good starting points. Because most CAD systems only allow single-user editing, one department in the organization normally handles all data maintenance. Because GIS provides multi-user access and has complex relationship rules, it is more efficient to decentralize the data maintenance responsibilities to multiple departments and maintain a centralized approval process.
  • Beside GIS deployment and data maintenance, other issues also need to be addressed to ensure a thorough GIS implementation. These issues include: system integration, user training, data backup, future upgrades strategies, etc.
  • In order for a GIS to adequately serve the needs of multiple departments, its design should also adhere to five basic principles, as appropriate:
    • The GIS should contain a complete and accurate inventory of the utility’s field-based assets.
    • GIS and Computerized Maintenance Management System (CMMS) integration is essential to obtain accuracy work histories / maintenance costs of each asset throughout their life-cycle.
    • The GIS should offer an accurate network model (i.e. able to trace Electrical networks upstream and downstream) and easily export data into modeling software packages supporting daily O&M activities as well as long-term planning projects.
      • As much as possible, GIS data layers should be cartographical adept (e.g. symbology, labeling, annotation) supporting (web) map production at multiple scales.
      • With time-enabled Software features, a possible emerging industry best practice is to consistently include an installation or acceptance date across all asset classes to give a correct historical viewing of the GIS database and integrated datasets.

Q5) With various organised and non-organised solutions and service providers around GIS solutions and services in Indian market, what best practices you would recommend in choosing right implementation partner(s)?

A)

  • There are multiple players needed to make GIS happen. They are:
    • Hardware Vendors: Choose right system, servers as per requirement of software. There specs should meet the software requirement.
    • Software Vendors: Choose right software with five year Integration plan with other systems.
    • GIS Data Model Implementation Vendor: Freeze all your business requirements in conjunction with operation, commercial, projects and other departments and decide the field data collection templates.
      • Data Collection Vendor: To see the competence of vendor with earlier experience in Implementations in utilities and feedbacks.
      • Data QA/QC and Data Ingestion to GIS System.
      • Testing of all tools and Application working with this Data.
    • There are lots of tasks that can be outsourced…, but these task needs to be closely monitored also. This can include:
      • Coordination with the Data Model Vendor to correctly freeze and ingest all requirements.
      • Data Collection vendor Data to be monitored and Supervised by in house utility team.
      • QA/QC of Data to be done by random sampling of 3% of Data by in house utility team.
      • Testing of Application by in house team after Data Ingestion.
    • There are lot of utility specific GIS solutions in the market but one has to adhere with following requirements before taking decision. They are:
      • Open platform: Selecting GIS technology that is based on an open platform enables a utility to easily integrate asset location information with other systems.
      • Scalability: The utility should look for a system that is scalable within a single database instance, making it easier to locate, analyze, integrate and manage data with other legacy corporate information systems such as a CIS or enterprise resource planning (ERP) system.
      • Mobile capabilities: Field automation offers proven ROI across the enterprise. The ability to share the same visual image between engineering, operations and the field is a critical component of a complete enterprise GIS strategy.
      • Industry standards: When a system meets international standards, a utility can work with data from multiple systems and have the benefit of interoperability. An open architecture based on industry standards is the foundation for interoperability across disparate data sources, formats and systems. A system that supports Open Geospatial Consortium (OGC), Web Map Service (WMS) and other standards enables a utility to ingest spatial information from multiple systems and does not limit it to one vendor.
      • Ability to share data: A GIS-solution vendor should enable a utility to leverage the Internet to seamlessly share data with other departments, organizations and the public. A Web based GIS application is an ideal tool for the viewing and distribution of existing data to both internal and external parties. This provides quick and easy online access to real-time data in a user-friendly environment.
      • Security: An often forgotten component of GIS implementation…, any utility data should be handled as securely as possible. This is because the “data” not only contains spatial information but also complete asset details including end consumer details. The adherence of the GIS solution vendor to the utilities own security standards is of at most importance.

Q6) What changes in business model you see emerging to allow utility to have one integrated Managed service provider in GIS space? What will be an ideal GIS service partner to you for your utility operations?

A)

  • In general, GIS departments are staffed with a mix of developers, system administrators, business analysts, data ‘specialists’ and so forth. Many utilities are now finding that more and more of these specialist spatial competencies (which involve core database skills, web services, a mix of industry software architectures and languages etc.) are difficult to come by and even harder to retain within their organisation.
  • From a delivery point of view, we have found that a hybrid Service Management Organization (SMO) model for GIS support can successfully deliver value and service excellence to the GIS user community. If properly designed and implemented, the SMO can also provide value to the organisation through:
    • Cost management: Through the SMO model, services are delivered based on clear commercial contracts, that can be accurately budgeted for in financial forecast
    • Resource management: The SMO model allows peaks and troughs in business, and change in business requirements, to be absorbed by service providers, alleviating the need for a growth and/or reduction internal staff size
    • Quality control: Quality of service is rigorously monitored and measured to ensure service excellence with enforceable SLA’s providing leverage to negotiate service costs and performance expectations
    • Strategic positioning: the SMO allows the organisation to be flexible enough to align with future outsourcing or insourcing direction for services.
  • When designing a GIS support infrastructure, an organisation ultimately needs to decide how to position its own resources – as an internal team specializing in GIS technology support, or a customer-focused team managing the delivery of services from a flexible menu of external service providers.

ARE DEVELOPING ECONOMIES AT RISK DUE TO POWER QUALITY ISSUES AND CHALLENGES?

Asia Power Quality Initiative (APQI) aims to create and build awareness on issues related to Power Quality (PQ). APQI was ‘Power Quality’ partner to IUKAN 2014 earlier this year. The group continues spreading the essential message of PQ to various stakeholders, helping businesses and industries with improved understanding and insights.

Recently, they published a very interesting blog on ‘ARE DEVELOPING ECONOMIES AT RISK DUE TO POWER QUALITY ISSUES AND CHALLENGES?’

This blog underlines the importance of PQ in today’s fast growing power electronics and IT driven businesses. Developing economies like India continue to struggle for 24×7 power supply and are lagging in terms of their PQ expectations though striving hard for energy efficient economy. The blog focuses on the associated economic impact due to PQ issues and challenges borne by developing countries. Can we afford to ignore that risk by remaining ignorant!

For detailed blog, please see following link: http://www.apqi.org/blog/are-developing-economies-at-risk-due-to-power-quality-issues-and-challenges.html

Evolving Distribution Franchisee Model across states

The Ministry of Power’s financial restructuring plan has made the introduction of private participation in distribution as one of the mandatory conditions for availing the benefits of scheme (as a result of high AT&C losses, low IT involvement and huge financial losses). Whilst State Governments’ (except Delhi and Odisha) have not undertaken privatisation of Discoms, Distribution Franchisee (DF) model has emerged as one of the attractive options to involve private players for enhancing distribution operations.

The success of Torrent Power as a DF player in Bhiwandi in Maharashtra has fuelled the other states to adopt this model. Other operational areas include Agra (UP), Nagpur (Maharashtra), Aurangabad (Maharashtra), Jalgaon (Maharashtra) and Sagar (MP).

Currently, utilities are going for Input and Investment-based Franchise Model, under which Franchise takes the responsibilities for power supply to customers, collection of revenue, management, upgradation and expansion of distribution infrastructure.

The licensees’ functions are limited to power supply at input points and keeping a check of regulatory interface. Lately new DF models are emerging like Input-based Franchise with Incremental Revenue sharing (IBF-IRS). Generally, zones with high consumption and transmission and distribution (T&D) losses are given to the franchise.

A brief outline on different types of DF model based on 3 states Odisha, Jharkhand and Bihar are mentioned below:

Odisha DF

The Central Electricity Supply Utility of Odisha (CESU) has adopted the IBF-IRS model for franchising areas. Under this model, the incremental revenue realized beyond the baseline revenue per unit (RPU) is shared between the DF and CESU at a pre-defined ratio. Penalty is imposed for not realizing the base RPU on the DF and it is revised every year based on the tariff indexation formula.

In IBF-IRS, the input energy is free of cost in order to alleviate the demand and price fluctuation-related risks. The IBF-IRS is only for five years and all assets below the distribution transformer (DT) are too maintained by the IBF-IRS DF. Also, the IBF-IRS DF mandates the installation of smart meters and partial Capex on the meters is to be recovered by 40 months through monthly meter rent.

CESU allotted 15 divisions with 1.3 million customers accounting for 77% of utility’s customer base with AT&C losses ranging from 51% to 72%. These franchises are awarded to Enzen Global Solutions Private Ltd., Feedback Electricity Distribution Company Ltd (FEDCO), River Side Utilities Pvt. Ltd. And Sea Side Utilities Pvt. Ltd. with the responsibilities of distribution-related activities and the task of reducing AT&C losses by 15% over a period of 5 years.

In Feb 2013, FEDCO commenced operations as a franchisee in Puri, Khorda, Balugaon and Nayagad divisions in Odisha across an area of 9,000 sq. km. (covering 4,00,000 consumers). The company has taken several steps to improve distribution operation and minimise AT&C losses, like setting up customer care center, spot collection, developing ERP for billing, etc. These steps resulted in increasing the billing coverage to 88% from 75%, collection coverage improved to 70% from 56%, AT&C losses reduced to 54% from 61%.

Jharkhand DF

Jharkhand State Electricity Board (JSEB) adopted Input-based DF model in Jamshedpur and Ranchi and were awarded to TATA Power and CESC LTD respectively. Ranchi circle covered 257,000 consumers, AT&C losses stood at 42% required to be reduced to 9% over the next 15 years.  The key feature of Ranchi DF agreement is the provision of an independent audit for baseline, which is important as often the asset and loss figures stated by state electricity boards are not accurate. E&Y is about to complete such an audit in Ranchi.

Bihar DF

The recently unbundled distribution utilities in Bihar have taken steps to improve operations through appointment of franchisees. While North Bihar Power Distribution Company Limited (NBPDCL) has appointed Essel Vidyut Vitaran Ltd. as a DF operator for Muzaffapur, South Bihar Power Distribution Company Limited (SBPDCL) has appointed India Power Corporation Ltd. (formerly DPSC limited) for Gaya and SMPL Infra Ltd. for Bhagalpur.

India Power will serve over 1,00,000 consumers. The franchise area had registered energy sales of 125 MUs and T&D losses of 62% during the base year. The company has planned to invest 330 million in the first five years to improve distribution operations by investing in meter replacement, consumer indexing, installation of billing systems etc.

The Way Forward

To ensure success of the franchise model between licensee and franchisee, it is important to implement an effective monitoring process. Some modifications are required in the franchisee framework, especially in provisions related to regulatory monitoring, loss reduction and consumer benefits, Capex investment and supply guarantees by the licensee.

Please note: Above is the summary of the recent article on Power Distribution Franchisee model published in PowerLine magazine, Feb 2014.

What is PQ? Whose responsibility is it?

India and most developing countries continue to struggle for 24×7 power supply, good Power Quality (PQ) environment, and Energy Efficient (EE) economy. See APQI earlier blog that tries to quantify economic impact from poor PQ environment – Are developing economies at risk due to power quality issues and challenges?

Another follow-up question will be WHO IS RESPONSIBLE FOR MAINTAINING GOOD POWER QUALITY? Answer to this is usually divided and depends upon whom we pose this question. Network Operator will blame his end-customers, Device Manufacturer will blame both the Network Operator and the end-customer, and end-customer usually has not much awareness, and believe that its supply problem from Network Operator.

In addition to above 3 key stakeholders, there are others like – Designers, Commissioning Engineers and Maintenance Engineers that also plays role in sustaining good PQ environment.Commissioning Engineer play the role in ensuring the quality of installation based on certain design standards.

Good installation is one of the necessities to maintain power quality during operations and to minimize voltage drop, sparking, overheating, etc. Maintenance engineers are subsequently responsible for preventing any glitches in operations which can result in power quality issue. For ex. loose connections lead to sparking;poor quality of wires results in voltage drops at customers premise, etc.

Further on, we shall focus upon 3 key stakeholders – Customers, Network Operators and Equipment Manufacturers.

INTER CONNECTEDNESS OF OUR GRID AND PQ

Simply put, Power Quality is a measure of quality of power supply on the grid. A PQ disturbance occurs in case of any deviation of voltage and current waveforms from the ideal. Voltage disturbances commonly originate in the network and affect the customers. On the other hand, current disturbances originate at a customers installation and affect the network components and other installations. Therefore, VOLTAGE QUALITY is considered to be primary responsibility of the network operator, while CURRENT QUALITY is primary responsibility of the end-customers.

Because of interconnected grid, PQ disturbances are caused both by upstream and downstream elements. Across various PQ disturbances, it is observed that customers are responsible for roughly 70% of the PQ problems, while the remaining 30% come from the network. One study by LPQI for 25 European Union countries in 2005-06, reported following % distribution of poor PQ electrical manifestation – transients and surges (29%), voltage dips (23.6%), short interruptions (18.8%), long interruptions (12.5%), harmonics (5.4%) and others (10.7%). (See European Power Quality Survey Report)

‘CUSTOMERS’ AND PQ INTERCONNECTION

Today’s customers are highly dependent on digital technology and power electronic devices, with increasing use of various types of electronic appliances, ballasts, variable speed drives, etc. These devices when used produce current distortions in the network due to their non-linear operating characteristics. These disturbances then travel upstream because of insufficient isolation of each customers from the grid. This increase current in turn causes additional energy losses in the system and also pose increased demand of apparent power to individual customer and also entire network faces the risk of premature aging and failure.

Some of commonly reported PQ complaints from end-customers:

Equipments affected by poor PQExternal  Manifestation of poor PQElectrical Manifestation of poor PQ
IT equipmentsComputer lock-ups and data lossPresence of earth leakage current causing small voltage drops in earth conductors
Variable speed drives, telecom equipments, arc furnace, welding equipment, relays, static converters, security and access control systems, etc.Motors and drives malfunctioning, computer screen freeze, loss of dataCapacitor bank failure, shocks due to neutral voltage, Flickering of lights, noise in telecom lines
Motors and process devicesMalfunctioning of motors and process devices. Extra heating, decreased operational efficiency and premature aging of the equipments.Presence of voltage and current harmonics in the power supply
Relays, circuit breakers and contactorsNuisance tripping of protective devicesDistorted voltage waveform because of voltage dip
Sensitive measurements ofprocess control equipmentLoss of synchronization in processing equipmentSevere harmonic distortion creating additional zero-crossings within a cycle of the sine wave

Table 1. Customers reported problem due to poor PQ Environment (Source: 2. Sharmistha Bhattacharyya and Sjef Cobben, Technical University of Eindhoven)With increased awareness, Customers can take below precautions to support building healthy PQ environment:

  • Maintain power factor within prescribed limits to reduce reactive power demand, which in turn will balance the voltage in their premise and also overall network
  • Reduce harmonic currents while using more energy efficient equipments at their premise
  • Keep a log of faced power disturbances at premises, which may come handy in finding effective solutions

‘NETWORK OPERATORS’ AND PQ INTERCONNECTION%

The Network Operators design and maintain key network characteristics like feeder length, number and sizing of Distribution Transformers (DT), DT load balancing etc. which in turn determine grid impedance and that influence the PQ level in the network. With high impedance in the network, PQ issues (mainly flicker and harmonics) become more prominent. Further, DT winding configurations and earthing problems also add to the harmonic behavior and voltage dips in the network.

Thus, technical Loss reduction and fixing PQ environment are strongly interrelated, and could be addressed though same investments. The main network components which get affected in terms of faster wear and tear through PQ disturbances are:

  • Transformers
  • Cables
  • Power-factor correction (PFC) Capacitors
  • Protective Devices, Digital Relays
  • Revenue Meters

The Network Operator can streamline its loss reduction initiatives with improving PQ environment in following ways:

  • Controlling voltage level at customers point of connection by reactive power management and take appropriate steps at the broader network level.
  • Maintaining load balance at Feeder and DT level, and reduce current losses. This will ensure increased power availability.
  • Doing regular PQ Measurements with advancement in technologies like SCADA, Smart Metering, etc. and designing relevant dashboards to facilitate timely actions
  • Isolating customer loads and their variations from main grid through use of Capacitor banking. Different variants like automatic power factor correcting devices, switched capacitors, Statics VAR compensators, dynamic voltage regulators etc. are available.

‘EQUIPMENT MANUFACTURERS’ AND PQ INTERCONNECTION

Organized and branded Equipment Manufacturers usually specify PQ immunity (EMI/EMC) of their equipment in terms of harmonic current emission and other parameters, as applicable under some Standards. However, in a real life situation, the network voltage is already distorted (and is non-sinusoidal) because of harmonic current emissions from other loads and customers in the network. This can result into distortions from their devices exceeding the ‘compatibility level’ of the system. The optimum performance of Equipment Manufacturers’device is not guaranteed when the supply voltage is distorted. Experiments show that devices produce higher harmonic currents when the supply voltage is distorted. Below table compares total harmonic current distortions (THD) of some households’ devices under sinusoidal and distorted supply voltage condition.

THD with respect to the total RMS current drawn by the device
Under clean voltage condition  Under distorted voltage       condition (THD = 6%)
TV48% 55%
Personal Computer87% 89%
Refrigerator10% 18%
CFL72% 79%

Table2. THD of devices under clean and distorted network voltage conditions (Source: 2. Sharmistha Bhattacharyya and Sjef Cobben, Technical University of Eindhoven)

The device manufacturer, however, cannot be blamed directly for such a situation as he is not responsible for his devices’ operations under a distorted supply voltage condition. But at the same time the manufacturers also need to ensure the immunity of equipments they manufacture against Electro Magnetic Interference (EMI) and specify the tolerance limits for same.

Question is should Manufacturer built in this isolation into its equipments, with resulting price hike, or should customer take collective facility isolation from main grid interference? While answer to this will be driven by market and regulations, still Manufacturers together with their installation teams could start giving weight to PQ issues during their installations and checking some basics like – capacitor bank, cables with larger neutral conductors, adjusting under voltage relays, etc.

CO-CREATING AN ECOSYSTEMFOR BETTER PQ MANAGEMENT

As we saw, poor PQ environment is caused by Customers, Network Operators and also Equipment Manufacturers. At the same time, poor PQ impacts all of them negatively – Network Operator has to face high losses, customers has to face increased break-down of equipments and higher bills, and Equipment Manufacturers has to face increased warranty costs. Therefore, to implement PQ mitigation, a systematic approach needs to be followed starting with to identify the responsibilities of each stakeholder in the network. (A good detailed ‘Decision making flow-chart’ on PQ solutions is shown in report ‘Consequences of Poor Power Quality – An Overview’)

Below figure illustrates the mutual responsibilities sharing among various stakeholders in the network.

Figure 1. Mutual responsibilities among various stakeholders in the network (Source: 1. Sharmistha Bhattacharyya)

With growing complexities both on the on end-customer side (via increasing usage of electronic appliances) and Network Operator side (via higher adoption of smart grids, smart meters etc), it is important that each stakeholders understand their contribution and impact from PQ, and take appropriate measures. End-Customers have to become more aware and demanding in their procurements of both power and also equipments, as at the end, it is them who pays out for these in-efficiencies. In US and Europe, there are clear SLAs for voltage supply and harmonics emission at the point of supply between the Network Operator and end-customers. Improved Regulation, policies, standards and end-customer awareness and reinforcement will play key role in guiding market for optimum equilibria for good PQ environment.

References

  1. Sharmistha Bhattacharyya, “Power Quality Requirements and Responsibilities at the Point of Connection
  2. Sharmistha Bhattacharyya and Sjef Cobben, Technical University of Eindhoven, “Consequences of Poor Power Quality – An Overview
  3. A. de Almeida, L. Moreira. J. Delgado, ISR – Department of Electrical and Computer Engineering, “Power Quality Problems and New Solutions
  4. Ministry of Power, GoI, “Strategic Blueprint
  5. Central Electricity Authority, “Regulations for Grid Standards

Asia Power Quality Initiative (APQI) aims to create and build awareness on issues related to Power Quality (PQ). The group continues spreading the essential message of PQ to various stakeholders, helping businesses and industries with improved understanding and insights. pManifold is supporting APQI team in content generation and wider sharing of message.

New Initiatives / steps taken by UGVCL to improve operational efficiency

The Uttar Gujarat Vij Company Limited (UGVCL), a second largest state discom in Gujarat serving almost 2.9 million customers, has its network spread across an area of 49,950 Sq. Km. It was the rated the second best state power distribution utility, by the Ministry of Power (MoP), with due recognition to its excellent performance in the financial front, and ensuing operational improvement and consumer-friendly practices.

The discom is forefront in taking effective steps to improve operational efficiency and provide better services to customers. Some of the steps taken have been the introduction of system strengthening schemes, expansion of metering coverage, installation of special design transformers that help in peak load management, an insurance policy to compensate for crops destroyed by fire due to electrical line faults and launch of a photo billing system.

Through these, the utility has been trying to control its rising aggregate technical and commercial (AT&C) losses but also help in peak load management through the installation of advanced metering infrastructure.A brief outline on different types of steps taken by the discom are mentioned below:

Operational performance

The utility’s AT&C losses have been increasing since 2010-11, when these stood at 6.63%. The losses touched 10.12% in 2011-12 and 14.07% in 2012-13; with increase in losses being attributed to low metering coverage of agricultural consumers, which only accounts for 36.75% in 2012-13, as compared to 28% in 2008-09, out of the total 100% metering provided. To address this issue, the utility

  • Releasing all new agricultural connections at metered tariffs. In 2013-14, it released 22,278 new agricultural connections and additional load of 201 MW for existing agricultural connections, by installing 3000 km of HIgh Tension (HT) lines, and 55 agricultural feeders, following bifurcation of existing agricultural feeders
  • Launched a state sponsored scheme viz., Jyotigram Yojana, introduced in 2006, which ensures 24×7 three phase quality power, the utility supplies electricity to scattered farm-houses, through feeders with specially designed Jyotigram transformers
  • Installs AB conductor cables in theft prone areas, undertaking mass anti-theft drives and replacement of electromechanical meters with static meters to bring losses below 20% for feeders with higher losses
  • Ensures timely and accurate billing in order to reduce losses by initiating photo billing system for 0.2 million consumers, sending billing information to consumers by SMS, and installation of radio frequency (RF)-based single phase meters to avoid human intervention in meter reading
  • Ensures energy conservation, cost efficiency and reduction in distribution transformer losses, the utility has introduced special design transformers – pilot advanced transformers (PATs) which provides single-phase power supply to farmers after the eighth hour; and this concept won the utility the ‘India Utility Knowledge and Networking Forum (IUKAN) 2014 – Best Practice Award‘ under the “Innovations and Others” category.

Smart Grid Pilot

UGVCL is one of the utility short listed for smart grid initiative under MoP. The project is being undertaken in two districts – Naroda and Deesa. The Rs. 487.8 million pilot project will cover about 375 substations across these districts. The scope of the project covers AT&C loss reduction, peak load management, developing advanced metering infrastructure (AMI), optimisation of unscheduled interchange charge, reduction in meter reading cost, outage management, load forecasting, demand side management and demand response, introduction of asset management systems and power quality management.

Five consortiums were shortlisted for proof of concept (PoC) in March 2014 for demonstrating their AMI connectivity solutions with 300 meters each. On basis of evaluation of PoC and bid price, the contract for the project will be awarded in September 2014. Few challenges faced by UGVCL at tendering stage includes interoperability issues, limited expertise of Indian companies, and absence of mechanisms to test imported technologies in India.

Future Plans

In a nutshell, the utility’s future plans are aimed at strengthening and upgrading its grid infrastructure through various initiatives like adding distribution lines at 11kV and LT levels, including the smart grid pilot. Loss reduction measures and ensuring consumer satisfaction through quality power supply are its top priorities, going forward.

Please note: Above is the summary of the article on Power Distribution Franchisee model published in PowerLine magazine, April 2014.

Visualizing India Electricity Distribution Market structural evolution

The Electricity (Amendment) Act, 2014 has envisaged separation of carriage (distribution network licensee) and content (electricity supply licensee). Rationale is to bring multiple supply licensees to increase competition and choice to end-customers, and drive improved efficiency and customer services. The network will be owned and managed by one preferably State agency, and will be regulated.

However there are many questions which still need to be answered clearly, and how do we reach to this new proposed state from existing state. We don’t have answers to all questions, and neither does anyone at this point of time. It has to be evolved, and what better than trying to visualize how this evolution might look like.

In our pictorial representation below, we have assumed base case of one State Discom utility, running one Input based Distribution Franchisee model in its one town, and how it might evolve. This is hypothesis, and idea is to invite expert comments to further improve this base view, and arrive at may be some kind of common visualization, as how our electricity distribution market will evolve, and in what time horizon.

Since, Electricity requires physical carrier (wire), it is recommended to not go for strict separation of wire and retail businesses between different entities. The last mile ‘Retailer’ (also referred as supply licensee) will be required to also play role of last mile ‘Network O&M’ agency. The Distribution Licensee can own all Network, with its responsibilities and investments limited till 33/11 KV sub-stations.

We look forward to good discussion on what you agree and don’t agree in above depicted evolution path

Impact of Power Procurement Costs on Discoms

The Indian Power Distribution landscape is changing rapidly and going through various developments and reforms. In addition to high AT&C losses, the sector is struggling with increasing share of power purchase costs and financial constraints. Further, unforeseen shortages of fuel and poor planning by power distribution companies (discoms) has led to a steep rise in the power purchase costs – the key reason for widening the gap between discoms costs and revenues.

Power purchase cost is the major portion (in the range of 70%-80%) of the total cost of supply and are outside the direct control of most distribution utilities in India.To add to woes, the financial position of the state electricity distribution sector has been a concern for over a decade.

The financial restructuring plan announced by government is expected to bail out the sector temporarily but in the long-term functional autonomy of discoms, reforms at the distribution level and investments to augment capacity is required to supplement the restructuring plan. Hence, power procurement cost reduction forms the strategic priority for most distribution utilities.

The current sources of power procurement are also a mix of sources from Central, State and Private sectors for most distribution utilities. The typical energy mix for Discoms is 80% Coal, 15% Hydro and the rest from other sources like Wind, Solar, etc. Short-term power purchase transactions contribute a very small fraction for most utilities.Some of the key reasons for increase in power procurement costs include,

  • Rise in generation costs, primarily because of hike in fuel prices
  • Transmission charges – inter and intra state

In addition to above, discoms has been facing challenges in assessing/forecastinginput energy demand due to the uncertainty of weather, T&D losses, changes in policy and other economical factors that drive industrial consumption. Most discoms uses mixed methods (trend analysis, in-house built tools, etc.) for load forecasting however, there is a need for national level demand side datasets to be made available for improving load forecasting. Although power purchase guidelines exist, discoms needs to be better equipped to deal with estimation of demand forecasting and scheduling.

Good load forecasting tools will help discoms manage variability in power procurement, which is a major challenge as of today. The demand for reducing power procurement costs is being driven through regulations and also due to the viability concerns for the discoms themselves. Hence, in order to reduce the power procurement costs, regulators continue to consider various policy level initiatives like driving O&M efficiencies of state generating plants, reduction in transmission charges, availability of imported coal at affordable costs and others.

Summarizing, given the high priority for power procurement cost reduction, the discoms need to undertake interventions like lowering of AT&C losses &hence quantum of energy procurement for same amount of revenue collections, use of load scheduling, power trading and banking, increasing renewable mix in power procurement (to mitigate rising fuel prices hike).

Impact of Net-Metering Policy on Solar Roof Top project parameters for Residential Consumers of Tamil Nadu, Andhra Pradesh & Karnataka

There has been a continuous and growing interest for grid connected solar rooftops across India. This is primarily due to shift in consumer behaviour across all consumer categories (residential, industrial, commercial, etc.). The consumer is not just interested in consuming electricity but also producing it. By installing solar in their own premise, they can now produce and save on electricity bills. This prosumer behaviour is expected to rise further and attract more interest and investment on solar rooftop models.

Each state has its own load profile and installation capacity. Hence, to match up the industry trend, ensure grid stability, reduce environmental impact and power companies’ losses, the solar rooftop policy varies from state to state. In general, we cannot say which state has a best solar rooftop net metering policy as there are several factors which need to be considered while making a comparison.

In this blog, we have compared the solar rooftop policy of three states for residential consumers: Tamil Nadu, Andhra Pradesh, and Karnataka. The key assumptions considered for comparison are mentioned below,

The simulation result of above parameters for three states is shown below,

Conclusion:

  • In residential solar rooftop with the 1kW system, Tamil Nadu has a favourable policy (payback less than 5 years) among the three states because of the subsidy provided by state government.
  • For given power consumption level, the bill saving due of Andhra Pradesh consumer is higher than Karnataka. This is mainly due to the tariff slab difference between the two states.

Scenario Analysis 1: Average Monthly Consumption Vs Payback Period (In years)

Higher the monthly units consumed, higher the power tariff and hence the electricity bill. Therefore, every solar unit generated will deduct one unit from higher power tariff slab. Below is the scenario analysis performed to check the impact on payback period by changing the input parameter ‘monthly consumption’ and keeping other parameters same.

Conclusion: The payback period is dependent on consumer tariff slab, monthly power consumption, and solar generation capacity.

Scenario Analysis 2: Debt Equity Ratio Vs Annualized cost of solar generation over 25 years

Below table summarizes the impact of interest rate and debt portion on annualized cost of solar generation over 25 years.

Conclusion: The debt portion has a significant impact on annualized per unit cost of generation. The cost per unit may go up to 42% higher when compared with no debt situation.

Overall Remarks

In general, the payback period for 1kW solar rooftop system is 10 to 15 years without subsidy. Keeping in mind, MNRE priority on residential buildings is lower and high payback period, the adoption of grid connected solar rooftop may take more time to unlock the potential residential category promises. Hence, state government needs to step forward to provide financial assistance to meet their renewable targets by 2022.

Similar kind of analysis can also be extended to compare the solar rooftop policy for other consumer categories (commercial, industrial, etc.). In such case, the benefits like a central subsidy, 80% accelerated depreciation, MAT credits, etc. also needs to be properly accounted to determine the solar project feasibility and tax liabilities for project developers.

Will the sun still shine bright for roof top solar in India by 2022?

India has a momentum with National Solar Mission with a goal of 40 GW IN 2022 for rooftop and recently, the goal for solar is extended to 100 GW in 2022. India and France launched International Solar Alliance to boost solar energy in 121 countries with an aim to deliberate on a finance mechanism for the promotion of solar energy in member countries, crowd-funding and technology transfer.

India’s present rooftop solar installed capacity is 1.9 GW which is 10% of total installed capacity of solar energy. Indian rooftop solar market is in nascent stage but government has an ambitious target of 15 GW by 2022. To add, several banks, including the State Bank of India (SBI) and Punjab National Bank, have committed to providing financing support to rooftop solar projects.

The World Bank announced a $625 million loan to SBI to provide discounted finance for rooftop solar installations on factories and institutions.

The environmental profile of rooftop solar is impressive compared to other renewable energy sources. Solar panels generate electricity with no air or carbon pollution, no ash or other waste products, and no inputs other than sunlight. Individuals and businesses have been attracted not just to the environmental benefits of solar power, but also to the ability to generate their own power.

Some of the major advantage of installing solar rooftop are:

  • Cleaner source of energy
  • Reduces imports of fossil fuel
  • Reduces dependency on grid power
  • Provides financial benefits as surplus energy produced is paid back (in the form of reduced electricity bill) by utility
  • Reduces T&D losses

As renewable energy is gaining popularity, the solar industry is growing very fast. But there are also challenges related to it. Some of them are listed below.

  • Variability and uncertainty of sunlight
  • No specific central regulation for solar PV power quality in India. As a result, validating the power quality of solar PV differs from state to state.
  • Massive exercise for DISCOM to keep check on power quality.
  • Criticality in performance measurement of Rooftop solar and inverter
  • No regulation for frequency response.
  • Karnataka is the only state in India having mandate for reactive power support.
  • No alternatives to meet contingencies of power flow.
  • Absence of accurate forecasting mechanism

Integration of rooftop solar has considerable impact on the grid which can be divided into technical and commercial impacts as mentioned by experts in APQI Webinar on ‘Impact of solar net metering on grid stability and preparations that Discoms can undertake’

  • Technical
    • Increases voltage rise, voltage imbalance and instability
    • Increases losses in the system and creates system protection issues
    • Stability of the system also hampers due to weather fluctuations.
    • Increases frequency fluctuation
  • Commercial
    • Initial installation cost is very high
    • Consumer is already sensitive and injection of solar system increases it

To overcome all the problems and make system more reliable and efficient, Discom has a vital role to play. Some of the major steps that DISCOM should undertake are as follows.

  • Participate from project development, installation and O&M stage for RTS.
  • Be proactive and consider RTS as a tool for providing supply
  • Act more like system operator and not network maintainer and power purchaser
  • Be brought on board through a technical and financial support
  • AMI should be used which enables accurate data gathering and establish two-way communication channel
  • Smart meters should be used to mitigate several grid integration challenges like transients, flickers, voltage fluctuations etc.
  • Energy Storage system (ESS) can be used which helps in proper demand supply management.
  • Micro grid controllers should be used as it helps in management of solar variability and uncertainty.

Conclusion: One of the important aspect to reduce the impact of roof top solar integration is to think of protection system for reverse power flow as current protection system is designed for unidirectional power flow. Load flow study needs to be done so that deciding capacity of distribution transformer for rooftop solar system gets easier.

The successful implementation of net metering policy will be critical for solar roof-top to grow in commercial and industrial segment. Different steps are already being taken by government such as National Smart Grid Mission, National Energy Storage Mission is in planning stage.

Discoms must be brought on board through a technical and financial support package.  Policy interventions by MNRE such as offering rooftop solar power a higher Renewable Purchase Obligation (RPO) credit can incentivize the Discoms to fulfill more of their RPO requirement. Such steps will reduce the perceived investment risk associated with the sector. Its implementation and proper functioning will be the key to scale up roof top solar and achieve the target of 40GW by 2022.

Ref:

  1. https://www.livemint.com/Industry/aOhc0bEziRHFuoR5ae03xO/Challenges-ahead-for-clean-energy.html
  2. https://www.ucsusa.org/clean-energy/renewable-energy/rooftop-solar-panels-benefits-costs-policies#.Ws8sS8aB28U
  3. http://www.solarquarter.com/index.php/perspectives/6845-key-challenges-in-managing-a-rooftop-solar-asset-portfolio-2

Authors:
Yamini Keche and Ashutosh Durselwar

Summit knowledge partner at 2nd Annual Electric Vehicle India Summit 2019

pManifold was the knowledge partner at 2nd Annual Electric Vehicle India Summit 2019 which was held from 25th – 27th February in Delhi organised by Explore Exhibition

The Summit was held for 3 days. 1-day Workshop followed by 2 days Conference where various EV Thought Leaders imparted knowledge & shared their insights with the audience.

Day 2 Rahul Bagdia, Director and Co-Founder, pManifold Business Solutions Pvt. Ltd. Moderated Panel Discussion:

What Indian EV industry needs in terms of policy changes in order to create the thrust.

  • EV Policies & Regulations – Current EV policies and regulations and their implications. How the federal, state, and local regulations interact with one another
  • Moving forward: What to expect from the new policies & their regulatory standpoint. Best practices & FAQs in regulatory frameworks to facilitate market-friendly uptake programs
  • Electric Vehicles moving forward? – The current state of Electric Vehicles, manufacturer’s perspective

Presentation coverage by Rahul Bagdia:

Day 3 Rahul Bagdia was a speaker and spoke on An in-depth survey into the possibilities for e-2 wheelers and e-4 wheelers fraternity.

Presentation : EV Charging Economics for 2W, 3W, 4W and Bus, and associated Private Investments & Financing

  • EV Adoption & Maturity across Vehicle Segments
  • Mix of EV Charging Options and Infra at City Level
  • Economics for EV & Charging
  • Business Models, Investments & Financing

pManifold launched “India EV Outlook Survey 2019Q1” during EV India Summit 2019 to consolidate industry views around some of the most important questions around EVs and India forward standing. Speakers & Participants actively participated in LIVE POLL and received an opportunity to see LIVE results.

We have launched it on one of our venture company pManifold Infolabs developed LIVE polling app “Consult Engine“. You can install it using Google play store on your Android, or take it on web app at https://app.consultengine.com/